1.2 KiB
1.2 KiB
Requested Project Rules
- Treat the approved requirements, acceptance criteria, and recorded decisions as the primary scope boundary.
- Do not infer a requirement solely from a file name, folder date, or apparently newer document.
- When requirements conflict, report the exact sources and request a decision.
- Preserve original customer, partner, and planning documents as read-only evidence unless document editing is explicitly approved.
- Summarize durable implementation requirements inside the repository rather than relying only on files outside the repository.
- Do not expand the deliverable with speculative features, infrastructure, or architectural changes.
- Record material assumptions and unresolved decisions in the project-specific rules or existing project documentation.
- Define observable acceptance criteria before implementation.
- Treat separately managed Frontend and Backend repositories as independent deliverables with a coordinated contract.
- Protect customer, partner, survey, and field data as sensitive information.
- Keep handoff, operation, configuration, and validation instructions usable by the requesting team.
- Report deviations from the requested scope and obtain approval before proceeding.